Showing 15 results

Archival description
Columbia-Shuswap (B.C.) Bridges
Print preview View:

Bridge - Mile 12.7

Bridge - Mile 12.7

Bridge Across Goldstream River, Mile 57.4

Bridge Across Goldstream River, Mile 57.4

Carnes Creek and Highway Bridge

Carnes Creek and Highway Bridge

Cisco C.P.R. Bridge

Cisco C.P.R. Bridge

Detail of Reconstructed Bridge, Mile 29.9, Double strut trussed beam - 36...

Detail of Reconstructed Bridge, Mile 29.9, Double strut trussed beam - 36' span

Gulch at "Shoo-Fly", later filled, Mile 47.2

Gulch at "Shoo-Fly", later filled, Mile 47.2

Gulch at "Shoo-Fly", later filled, Mile 49.1

Gulch at "Shoo-Fly", later filled, Mile 49.1

Holdich Creek Bridge

Holdich Creek Bridge

Reconstructed Bridge, Mile 29.9 (from upstream)

Reconstructed Bridge, Mile 29.9 (from upstream)

Red Rock Gulch before Reconstruction, Mile 43.2

Red Rock Gulch before Reconstruction, Mile 43.2

Remains of Trestle Bridge destroyed by snowslide, Mile 21.2

Remains of Trestle Bridge destroyed by snowslide, Mile 21.2

Stoney Creek Bridge, Selkirks. 296 Ft. high.

Stoney Creek Bridge, Selkirks. 296 Ft. high.

Stony Creek Bridge, height 296 feet

Stony Creek Bridge, height 296 feet

The Loop, showing four tracks

The Loop, showing four tracks

The Loop. C.P.R. Selkirks showing four tracks

The Loop. C.P.R. Selkirks showing four tracks