Showing 75 results

Archival description
Anderson, F.W.
Print preview Hierarchy View:
Construction of Big Bend Highway (West Leg)
Construction of Big Bend Highway (West Leg)
F.W.A, Archive Irving (in car), J.F. Bourne, instrument
F.W.A, Archive Irving (in car), J.F. Bourne, instrument
F.W.A. Headquarters, Camp 23 Mile
F.W.A. Headquarters, Camp 23 Mile
View from Highway M. 30.5
View from Highway M. 30.5
FWA and Frank Thorne, Camp 27 Mile
FWA and Frank Thorne, Camp 27 Mile
FWA - Mile 50.7
FWA - Mile 50.7
Holdich Creek Bridge
Holdich Creek Bridge
Carnes Creek and Highway Bridge
Carnes Creek and Highway Bridge
"Gulliver", James Graham, foreman, Camp 23 Mile
"Gulliver", James Graham, foreman, Camp 23 Mile
Jos Hammond and FWA on Tote Road, Mile 60
Jos Hammond and FWA on Tote Road, Mile 60
G. Wohannsen with improvised drilling machine
G. Wohannsen with improvised drilling machine
Slide in First Canyon, Mile 4
Slide in First Canyon, Mile 4
Slide in First Canyon, Mile 4.5
Slide in First Canyon, Mile 4.5
Scoured about foundation - Bridge Mile 9.6
Scoured about foundation - Bridge Mile 9.6
Bridge - Mile 12.7
Bridge - Mile 12.7
Mile 17.5
Mile 17.5
Remains of Trestle Bridge destroyed by snowslide, Mile 21.2
Remains of Trestle Bridge destroyed by snowslide, Mile 21.2
G. Wohannsen with improvised drilling machine he made.
G. Wohannsen with improvised drilling machine he made.
Light delivery wrecked by falling tree on highway - bush fire, Aug. 1936, Mile 20.7
Light delivery wrecked by falling tree on highway - bush fire, Aug. 1936, Mile 20.7
Crib construction - Clay sand slope, Mile 23.5
Crib construction - Clay sand slope, Mile 23.5
Looking north - hand sloped, Mile 21.6
Looking north - hand sloped, Mile 21.6
Men sloping, high gravel bank, excavated by 60 cat., Mile 23.7
Men sloping, high gravel bank, excavated by 60 cat., Mile 23.7
Carnes Creek and Highway Bridge, M 24.3
Carnes Creek and Highway Bridge, M 24.3
60-Cat with men sloping North side of Carnes Ck., Mile 24.3
60-Cat with men sloping North side of Carnes Ck., Mile 24.3
Looking north toward Holdich Ck. Bridge, Mile 25.3
Looking north toward Holdich Ck. Bridge, Mile 25.3
Finished Approach to Holdich Ck. Bridge, Mile 25.3 (same locaility as previous view)
Finished Approach to Holdich Ck. Bridge, Mile 25.3 (same locaility as previous view)
Men making gumbo slope - Mile 29.75
Men making gumbo slope - Mile 29.75
Detail of Reconstructed Bridge, Mile 29.9, Double strut trussed beam - 36' span
Detail of Reconstructed Bridge, Mile 29.9, Double strut trussed beam - 36' span
Reconstructed Bridge, Mile 29.9 (from upstream)
Reconstructed Bridge, Mile 29.9 (from upstream)
Looking North, Mile 36.2
Looking North, Mile 36.2
Looking North, Mile 36.2, after brushing - same location as previous
Looking North, Mile 36.2, after brushing - same location as previous
Byers gas shovel and men sloping, North side of Keystone Ck., Mile 39.0
Byers gas shovel and men sloping, North side of Keystone Ck., Mile 39.0
Looking South, Mile 38.65
Looking South, Mile 38.65
Making Cut and Fill at Gumbo Section, Mile 39.4
Making Cut and Fill at Gumbo Section, Mile 39.4
"Piling" to hold shoulder of Gumbo Fill, Mile 39.4 (same place as previous)
"Piling" to hold shoulder of Gumbo Fill, Mile 39.4 (same place as previous)
Gas Shovel using "gill-poke" to slope clay-sand bank near top of Downie Hill, Mile 41.1
Gas Shovel using "gill-poke" to slope clay-sand bank near top of Downie Hill, Mile 41.1
View looking South from top of Downie Hill, Columbia River on right, Mile 41.4
View looking South from top of Downie Hill, Columbia River on right, Mile 41.4
View looking South along Finished Road, Mile 41.5
View looking South along Finished Road, Mile 41.5
Red Rock Gulch before Reconstruction, Mile 43.2
Red Rock Gulch before Reconstruction, Mile 43.2
Same underconstruction to elminate "shoo-fly" bridge and to improve grade and alignment
Same underconstruction to elminate "shoo-fly" bridge and to improve grade and alignment
60-cat with backfill blade making fill on north side of Red Rock Gulch, Mile 43.2
60-cat with backfill blade making fill on north side of Red Rock Gulch, Mile 43.2
Heavy Crib (cedar) Construction at Toe of Boulder, Clay Slope, Mile 43.3
Heavy Crib (cedar) Construction at Toe of Boulder, Clay Slope, Mile 43.3
View from Highway, looking south, Columbia River, Mile 44.2
View from Highway, looking south, Columbia River, Mile 44.2
Close-up Skewing Toe Crib and Culvert Capping, Mile 44.98
Close-up Skewing Toe Crib and Culvert Capping, Mile 44.98
20-Cat with Bulldozer Grading after Blast in Solid Rock Cut, Mile 45.6
20-Cat with Bulldozer Grading after Blast in Solid Rock Cut, Mile 45.6
Gulch at "Shoo-Fly", later filled, Mile 47.2
Gulch at "Shoo-Fly", later filled, Mile 47.2
Gulch at "Shoo-Fly", later filled, Mile 49.1
Gulch at "Shoo-Fly", later filled, Mile 49.1
Bridge Across Goldstream River, Mile 57.4
Bridge Across Goldstream River, Mile 57.4
Construction of Tote Road, Mile 59.0
Construction of Tote Road, Mile 59.0
Tote Road (one way) in good mixed timber, Mile 59.9
Tote Road (one way) in good mixed timber, Mile 59.9
Results 1 to 50 of 75